New Resource Adequacy Criteria for the Energy Transition: Modernizing Reliability Requirements

This report was originally published by the Energy Systems Integration Group (ESIG) in March 2024.

This report, New Resource Adequacy Criteria for the Energy Transition: Modernizing Reliability Requirements, outlines the need for, and a path toward, the use of a multi-metric criteria approach in resource adequacy analysis.

As we move toward a cleaner and more weather-dependent power system, ensuring resource adequacy becomes more nuanced. It requires a new way of setting resource adequacy thresholds that is responsive to the rapid load growth, plant retirements, and a shift toward variable and energy-limited resources. Resource adequacy criteria set the level of supply- and demand-side resources required for a power system to meet its reliability objectives. This standard influences billions of dollars of investment decisions.

The most common resource adequacy criterion today—the one-day-in-10-year loss-of-load expectation (or LOLE) in North America. However, this single metric only measures the frequency of outages and doesn’t capture the size, duration, or timing of generation shortfalls. It also treats longer or widespread outages as equal to shorter, less severe outages. This failure to accurately reflect the real-world nature and impact of power outages, which vary enormously in their economic and human consequences, limits planners’ ability to accurately and efficiently plan a reliable system.

View the full report here.